Redirecting to the parent site...

welspun-enterprises-logo
img

PROJECT - I

Mithi River Water Quality Improvement Project, Mumbai

Project Description

Diversion of Dry Weather Flow from Bapat Nalla And Safed Pul Nalla to Dharavi Wastewater Treatment Facility (WwTF) in Mumbai through segment tunnelling.

img

PROJECT - II

Britannia Storm Water Pumping Station, Mumbai

Project Description

3110 MLD capacity, Catchment Area No. 125 & Area Coverage 512 Hectares. It is located at Reti Bunder Bey, near Reay Road Railway station in Mumbai. The purpose was to improve the storm water drainage system in Mumbai.

img

PROJECT - III

Laying RC Pipe Sewer Lines through Microtunnelling, Mumbai

Project Description

The project involves the installation of a reinforced concrete (RC) pipe sewer line extending from Anik Wadala to CST Road Junction in Mumbai. Utilizing advanced micro-tunneling and pipe jacking methods, this project aims to enhance the sewerage facilities in the Anik Wadala area. It includes comprehensive ground improvement measures and related works to ensure the successful completion of the project.

img

PROJECT - IV

Rehabilitation of Sewer Lines by Trenchless Technology, Mumbai

Project Description

Rehabilitation work is carried out with GRP Pipes, Structural Standalone Type-II liner withstanding combined ground water (hydrostatic) load, soil load and traffic load in its own right without requiring any structural contribution from the parent sewer and has the ability to resist corrosion in the atmosphere. The minimum life of installed GRP liner is 30 years.