Britannia Storm Water Pumping Station, Mumbai

Project Description

3110 MLD capacity, Catchment Area No. 125 & Area Coverage 512 Hectares

Location

Britannia storm water pumping station is located at Reti Bunder Bey, near Reay Road Railway station in Mumbai

Purpose

To improve the storm water drainage system in Mumbai

Details

Britannia Storm Water Pumping Station is a part of Brihanmumbai Storm Water Drain (BRIMSTOWAD) project which is launched by Municipal Corporation of Greater Mumbai. The pumping station aids in mitigating water-logging observed in flood-prone areas of Hindmata area, Abhuyadaya Nagar, Petit Lane, Jijibhoy lane, Madkebua chowk, Kalachowki, Lalbaug and areas surrounding Reay Road and Byculla.

Scope

Civil Works:
  • Area of Pumping Station – 2,200 Sq Mtr
  • Construction of Cofferdam including excavation, up to 11mtrs in subsoil and marine water conditions (Quantity 13,000 m3)
  • RCC Works – Concrete Qty 9,000 m3, Reinforcement Steel (CRS) – 650 MT
  • Construction of 20 mtrs high super structure
Electrical & Mechanical Works:
  • Diesel Generating Sets – 3 nos – 1650 kVA capacity
  • Axial Flow Submersible Pumps – 6 nos with motor of 530 kW, Pump discharge capacity of 6,000ltrs/sec at 6 mtr head.
  • Stop Logs – 3.75 mtr x 5.25 mtr
  • Sluice Gates – 6 nos – Electrically operated 3.5 mtrs wide x 2 mtr height.
  • Mechanical Screens – 6 nos – Multi Raking Screens 3.5 mtr (wide) x 6.7 mtrs (height)
  • Anti-Flooding Gates (Mitre Gates) – 2 nos – 3.75 mtr (wide) x 5.2 mtr (height)
  • EOT Cranes – 4 nos – 15 to 20 tonnes capacity
  • High Tension Panels for DG’s and Pumps. Soft Starters, Dynamic Compensators, Automatic Power Factor Control Panels.
Instrumentation Works:
  • SCADA Controlled automation
  • Auto Operation of Pumping Station
  • Historian Server with Informix data base